Skip to main content

963340

Details

AADF latest year 2009
Region South East
Local authority Hampshire
Road name U
Road type Minor
Start junction road -
End junction road -
Link length -
Easting & Northing 488000,150000
Latitude & longitude 51.2424,-0.7407

Location

Contents

Average Annual Daily Flow

Average annual daily flow
Year Count method All motor vehicles Cars & taxis LGVs HGVs Pedal cycles Motorcycles Buses & coaches
2009 Manual count 12,336 8,691 2,857 594 62 183 11
2008 Manual count 15,412 11,763 2,702 715 89 168 64
2007 Manual count 13,847 10,162 2,794 666 80 209 16
2006 Manual count 13,900 10,139 2,849 719 112 167 26
2005 Estimated using AADF from previous year on this link 11,825 8,353 2,697 665 41 64 46
2004 Manual count 11,628 8,303 2,563 635 52 83 44
2003 Manual count 12,252 9,055 2,282 704 69 182 29
2002 Manual count 12,412 9,419 2,200 669 38 91 33
2001 Manual count 13,114 10,100 1,957 807 97 228 22
2000 Manual count 12,187 9,250 2,134 619 91 167 17

Download data

Data disclaimer

Traffic figures at the regional and national level are robust, and are reported as accredited official statistics. However, DfT’s traffic estimates for individual road links and small areas are less robust, as they are not always based on up-to-date counts made at these locations. Where other more up-to-date sources of traffic data are available (e.g. from local highways authorities), this may provide a more accurate estimate of traffic at these locations.

It is the responsibility of the user to decide which data are most appropriate for their purpose, and if DfT road link level traffic estimates are used, to make a note of the limitations in any published material.

Quality flags in data downloads

DfT’s road link level traffic estimates are calculated using a variety of methods, with some methods likely to produce more accurate estimates than others.

The data tables available to download here contain a column - estimation_method – showing the method used to estimate traffic for each location and year. Figures having an estimation method of “Counted” are likely to be more accurate than those marked as “Estimated”, and the latter should be used with caution.

Site details
Manual count point site 963340 details
Average annual daily flow
Number of vehicles that travel past the count point (in both directions) on an average day of the year.
Average annual daily flow by direction
Number of vehicles that travel past the count point on an average day of the year, by direction of travel.
Raw counts
Vehicle counts recorded at this count point.
Data Description Records Download
Site details Manual count point site 963340 details 1
Average annual daily flow Number of vehicles that travel past the count point (in both directions) on an average day of the year. 10
Average annual daily flow by direction Number of vehicles that travel past the count point on an average day of the year, by direction of travel. 20
Raw counts Vehicle counts recorded at this count point. 216

To apply more filters to downloads, or retrieve data split into pages you can use our API.