Skip to main content

961210

Details

AADF latest year 2009
Region East Midlands
Local authority Nottingham
Road name U
Road type Minor
Start junction road -
End junction road -
Link length -
Easting & Northing 457113,340000
Latitude & longitude 52.95436,-1.15133

Location

Contents

Average Annual Daily Flow

Average annual daily flow
Year Count method All motor vehicles Cars & taxis LGVs HGVs Pedal cycles Motorcycles Buses & coaches
2009 Manual count 874 86 53 0 180 2 733
2008 Manual count 856 53 62 15 118 0 726
2007 Manual count 895 84 53 9 50 2 747
2006 Manual count 1,117 53 89 39 147 5 931
2005 Manual count 751 117 73 30 103 2 529
2004 Manual count 1,262 120 77 234 289 10 821
2003 Manual count 981 86 107 33 268 7 748
2002 Estimated using AADF from previous year on this link 2,096 722 169 48 49 11 1,146
2001 Manual count 2,280 714 165 47 48 10 1,344
2000 Manual count 3,019 1,190 185 49 76 16 1,579

Download data

Data disclaimer

Traffic figures at the regional and national level are robust, and are reported as accredited official statistics. However, DfT’s traffic estimates for individual road links and small areas are less robust, as they are not always based on up-to-date counts made at these locations. Where other more up-to-date sources of traffic data are available (e.g. from local highways authorities), this may provide a more accurate estimate of traffic at these locations.

It is the responsibility of the user to decide which data are most appropriate for their purpose, and if DfT road link level traffic estimates are used, to make a note of the limitations in any published material.

Quality flags in data downloads

DfT’s road link level traffic estimates are calculated using a variety of methods, with some methods likely to produce more accurate estimates than others.

The data tables available to download here contain a column - estimation_method – showing the method used to estimate traffic for each location and year. Figures having an estimation method of “Counted” are likely to be more accurate than those marked as “Estimated”, and the latter should be used with caution.

Site details
Manual count point site 961210 details
Average annual daily flow
Number of vehicles that travel past the count point (in both directions) on an average day of the year.
Average annual daily flow by direction
Number of vehicles that travel past the count point on an average day of the year, by direction of travel.
Raw counts
Vehicle counts recorded at this count point.
Data Description Records Download
Site details Manual count point site 961210 details 1
Average annual daily flow Number of vehicles that travel past the count point (in both directions) on an average day of the year. 10
Average annual daily flow by direction Number of vehicles that travel past the count point on an average day of the year, by direction of travel. 20
Raw counts Vehicle counts recorded at this count point. 216

To apply more filters to downloads, or retrieve data split into pages you can use our API.